Tips & Tricks II

for using power quality meters and typical user errors

This topic is divided into two posts (Tips and Tricks Part 1 and Part 2). This is the part 2.

Theoretical basics

When using mobile network analyzers, the question often arises as to how the measuring device can be supplied with power, since power outlets are rarely available in the vicinity. This applies both to the house connection and to cable distribution boxes outdoors or, as shown in the example below, at a concrete pole station.

1 Outdoor-Measuring with a PQ-Box 150

One possibility is to connect the measuring device directly via the voltage taps at the measuring point. However, it is important to ensure that the voltage to which the device is connected corresponds to the technical data of the power supply unit, as the measuring range of the devices is usually greater than what the power supply unit can handle. The power supply units of the PQ boxes can be operated between 100 and 500 volts with AC or DC, however, when used in a 690V industrial network, for example, it should be ensured that the voltage is not too high, otherwise the device or the power supply unit can be damaged. Also, a voltage that is too low can harm switching power supplies as well, as it will thermally overload them due to the high current. It is important to consider the correct voltage for the power supply when connecting devices to the measurement voltages. When making measurements on voltage transformers in a medium voltage network, measurement devices could theoretically be supplied with 100V from the chained voltage, but this is not recommended.


It should be noted that switching power supplies, cause harmonics. These current harmonics cause corresponding voltage harmonics at the high load of the voltage transformer and thus falsify the result of an evaluation of the voltage quality. For a pure power measurement, the supply of the devices via medium voltage transformers can be considered.

2 Before starting the measurement: check if all voltages are connected correctly

Before starting the recording for the week, it is important to check if all voltages and currents are connected correctly. This can be checked very easily via the display of the devices. When using current clamps, make sure that they are always tightly closed, as even a small opening can lead to large measurement errors.
A negative sign of the active power indicates that the system is feeding power back into the grid, while a positive sign means that the system is drawing power from the grid. If the power flow or the sign of the power is incorrect, the current clamp has been installed in the wrong direction and must be rotated by 180°.
If the assignment of voltages and currents does not match the correct phase in the network, this can be recognized quite easily in the online pointer diagram or also in the displayed phase angle between voltage and current.

Current measurement at bundle conductors

3 Current measurement at bundle conductors

When measuring currents on bundle conductors (in this case 12 single conductors per phase), it should be noted that the currents in the individual single conductor cables can be distributed very asymmetrically. Thus, it is often not possible to place the Rogowski current clamp around only 1/3 of the cable and then multiply this measured value by 3. An alternative would be to use Rogowski coils of sufficient length and place them around the complete cable bundle.

4 FFT spectral analysis up to 20kHz

Is my measurement device capable of detecting the desired high-frequency disturbance? An FFT analysis was performed to detect the frequencies, harmonics and switching frequencies in the local network. This local network is the subject of numerous complaints from customers. Equipment failures, malfunctions, and whistling noises in equipment or bell transformers are the most common complaints. In this example, it is the suparharmonic frequencies that clearly stand out.

5 The right PQ box for every frequency range

The EN50160 offers only limited help with regard to the identified disturbances in the range of super harmonics. This standard is limited to the evaluation up to the 25th harmonic. There are no compatibility levels above 1,250 hertz. In comparison, the EMC standard IEC61000-2-2 has limits and compatibility levels for the public low-voltage network up to 150 kilohertz.
The measuring device and also the current clamps that are used must be able to detect the desired disturbance. As an example, the PQ-Box 100 is considered in Figure 6. This scans at a sampling rate of 10.24 kilohertz and therefore would not be able to detect the 10 kilohertz repercussion. Its bandwidth is limited to 5 kilohertz. To capture this disturbance, the PQ boxes 150 to 300 would be better suited, operating at sampling rates from 20 to over 400 kilohertz. Picture No. 6 was taken with a PQ-Box 200 and shows the interference signal in the oscilloscope image.

6 Example: Oscilloscope image recorded with PQ-Box 100 (10kHz)

An oscilloscope image recorded with a PQ-Box 100 serves as an example here. It shows a perfect sine wave.

7 The oscilloscope image at the same measuring point with a PQ-Box 200 (40kHz)

In comparison, measurements were taken again at the same measuring point using a PQ-Box 200 with a sampling rate of 40 kilohertz (Figure 7). Here, the 10 kilohertz can clearly be seen as a feedback effect with a level of 1.7 volts, which is the cause of the problems with various loads.

Trigger settings

When considering which measurement data to acquire with a power quality analyzer, it is important to choose the trigger criterion carefully. Usually, a trigger threshold is taken for when fast fault records are triggered, such as falling below or exceeding a voltage or current threshold. This setting makes it possible to record mains dips or starting currents of machines as oscilloscope image or ½ period recorder.

8 Set prehistory/posthistory of trigger events

However, in order to record the cause of failures of systems or consumers, it can be useful to trigger an undershooting of a current threshold. Since the trigger criterion is usually only fulfilled when the system fails, a long history is required for later evaluation.
All PQ boxes have the possibility to record up to 600 seconds of prehistory. In this way, the evaluation of the measurement data over a long period of time before the failure of the system recognizes the reason

9 Example; ½ period recorder failure CHP (combined heat and power unit) with long history before the fault.

In the example, a network analysis was performed on a CHP unit that failed several times a week. A clear trigger criterion that occurs when the CHP unit fails is that a current threshold is undershot. The nominal current of the plant was 70A. A value of 60A was set as the trigger threshold. If the plant current drops below this value, the PQ box in this example records 100 seconds of pre-disturbance history and 20 seconds of post-disturbance history. The reason for the disturbance could be found via the prehistory.

Author
Jürgen Blum, Product Manager Power Quality Mobil

Want more information about our products?

Contact us here!


Contact

News from the product group

News

General Knowledge

Voltage Monitoring

Find out everything you need to know about voltage monitoring in this article. What is voltage monitoring, why is voltage monitoring essential for both energy supply companies and industrial companies and how is it implemented in compliance with standards?

Read more

General Knowledge

What Is Load Profile Measurement/Power Measurement?

This article explains the definition and difference between load profile measurement (RLM), power measurement and measuring the standard load profile. These are important methods for accurately recording energy consumption in commercial, large industrial plant as well as in the public energy grid.

Read more

Training Video

»PQMobil« Training Video 4: Create and Configure PQ Reports With Software WinPQ mobil

This video explains everything about creating and configuring power quality reports with »WinPQ mobil«.

Read more

Webinar

»PQSys« Webinar: PQ-Monitoring & Feeder Current Measurement in Low-Voltage Grids

Webinar recording from 17.04.2024: »PQSys - PQ-Monitoring & Feeder Current Measurement in Low-Voltage Grids«.

Read more

Training Video

»PQMobil« Training Video 3: Usability & Functions of the PQ-Box App

This video gives you an introduction to the usability and functions of the »PQ-Box App« for our portable power quality analysers.

Read more

Training Video

»PQMobil« Training Video 2: Menu Navigation and Operation of the PQ-Box

In this short introductory video, we present to you how to navigate and operate our portable power quality analysers »PQ-Box 150«, »PQ-Box 200« & »PQ-Box 300« of the PQ-Box family.

Read more

Training Video

»PQMobil« Training Video 1: Getting Started with the PQ-Box

This video shows in detail how to connect the »PQ-Box« and record measurements. The »WinPQ mobil« software is then used to visualize and analyse the measurement data and create a report.

Read more

General Knowledge

Residual current

In this article, you will learn about residual current measurement & residual current monitoring and why it is important to measure residual current.

Read more

General Knowledge

Power Quality

Good power quality is characterized by the fact that the mains voltage actually arriving at the consumer matches the mains voltage promised by the utility company.

Read more

General Knowledge

Reactive power – definition, calculation and measurement

The key role of reactive power in electrical engineering: definition, calculation, measurement and the differences to active power and apparent power. Find out how reactive power influences the efficiency of electricity grids and shapes energy transmission.

Read more

General Knowledge

What is apparent power and how is it calculated?

This article addresses the question of what apparent power is and how to calculate it. An understanding of apparent power is crucial for the correct dimensioning of inverters and therefore for the optimum efficiency and performance of photovoltaic systems.

Read more

General Knowledge

Ready for the smart grid of the future?

All information about smart grids/intelligent power grids, the technology behind them, advantages, disadvantages, challenges and current distribution.

Read more

Info letter

Information Letter No. 24: Integration guide for the metering of a power plant according to the Requirements for Generators (2016/631) RfG

Integration guide for the measurement of a power plant (EZA) according to VDE-AR 4110 and VDE-AR 4120.

Read more

Info letter

Info Letter No. 23: Direction of harmonics Sources of harmonics in the power system

Le sens du flux de puissance des harmoniques est déterminé par le signe de la puissance activ

Read more

Info letter

Info Letter No. 22: Definition of power measurements according to the standards DIN 40110-2 and IEEE 1459

There is a wide range of electronic measuring devices for the digital measurement of power...

Read more

Info letter

Info Letter No. 20: Capacitance of conductors

In the conductors of electrical power supplies, a distinction is made between the operating capacitance...

Read more

Info letter

Info Letter No. 19: The evaluation of power quality and detection of interference in medium voltage network

For various reasons, interest in the continuous monitoring of network quality in medium-voltage...

Read more

Info letter

Info Letter No. 8: Apparent power and reactive power in three-phase networks

The range of electromechanical and electronic measuring devices in analog - and digital technology...

Read more

Info letter

Info Letter No. 5: Zero sequence voltage in three-phase networks

With balanced network operation and inequality of the impedances in the consumer circuit, the phase...

Read more

Info letter

Info Letter No. 4: Summation of Alternating Currents

For the parallel connection of power sources, the principle of superposition applies, when all resources...

Read more

Info letter

Info Letter No. 2: Measurement Transformers in three-phase networks (Part 2)

In a symmetrically loaded three-wire three-phase network, a two-pole insulated voltage transformer...

Read more

Info letter

Info Letter No. 1: Measurement Transformers in three-phase networks (Part 1)

The direct connection of measuring devices into the network is limited for safety reasons to values...

Read more

Special Publication

Ferrari´s Meter vs. Electronic Meter

This technical report analyzes a power measurement at a large industrial customer. The customer records very high currents and fifth harmonic voltages during production time, which leads to poor voltage quality.

Read more

Special Publication

Angle determination of voltage and current harmonics in practice

Today's devices and equipment such as switched-mode power supplies, frequency converters, regulated drives, charging devices for e-mobiles or LED lighting work internally with high clock frequencies in order to regulate power efficiently. These can lead to both conducted and field-bound (coupled) influences in the energy grid. In this technical report, we explain how you can detect these sources of interference in the grid using suitable measuring technology.

Read more

General Knowledge

All „Supra“ with your grid?

Today's devices and equipment such as switched-mode power supplies, frequency converters, controlled drives, charging devices for e-mobiles or LED lighting work internally with high clock frequencies in order to regulate power efficiently. These can lead to line-borne as well as field-borne (coupled) interference in the power grid. In this technical report, we explain how you can detect these sources of interference in the grid using suitable measurement technology.

Read more

Contact request:



* Mandatory

Your data is being processed

a-eberle kontakt newsletter ×

Our seminars &
webinars

► Register here!

x